Modular building construction
Only quality materials are used in the production of modules in the factory. In dry conditions, the production ensures a controlled result of the wooden elements of the building. When building a construction site, materials (frames, wool, construction boards) have a constant risk of getting wet, which can significantly impair the quality of the building.
Building modules will significantly reduce the subscriber’s problems with subcontractors as most of the work is done at the factory.
If necessary, the modules can be re-opened and rebuilt elsewhere (for example, for kindergartens and schools).
Module construction speed
The construction speed of a modular building depends on the complexity of the object, but as a rule, the installation of one module lasts for 30-60 minutes. On average, 10-12 modules (30m2 of floor space) are installed per day, with a total living space of about 300 m2 in a high level of completion per day. Largest apartment buildings are assembled on a finished foundation for one week. The construction of modules will significantly save time and will reduce the construction waste on the site. The construction of modules shortens construction time on the site and reduces the overall cost of construction.
Construction site
On the construction site, modules are connected together and the necessary connections are made to water, sewage and electricity. The interconnections between the modules will be finalized in an agreed manner. Typically 10-20% of modular building construction is left to be completed in the field
Products
Modular building construction
Largest apartment buildings are assembled on a finished foundation for one week. The construction of modules will significantly save time and will reduce the construction waste on the site.
view moreModular building construction
Largest apartment buildings are assembled on a finished foundation for one week. The construction of modules will significantly save time and will reduce the construction waste on the site.
view moreElement houses
All elements of the element house are completed as large elements in the factory. For example, an external wall with doors and windows, or a roof with a covering material, is factory built and mounted on a mast, significantly reducing construction time.
view moreModular buildings
Prefabricated modules are manufactured at a very high level of completion. As a rule, modules are crafted from inside and outside up to 80-90% and furniture is installed. Economically, it is most reasonable to build modular buildings where similar modules can be used.
view moreSamples of Our Work
Timber frame element building in Sweden
Timbeco designed, produced and installed a school building made of wooden elements in the municipality of Järfälla in Sweden. The building meets Miljöbygg requirements.
View moreA terraced house in Mariehamn, Åland
Timbeco designed, produced and installed a terraced house in Mariehamn, Aland
View more